4digit Emergency Number
1075
Available 24 hours a day
Interactive Map
Click and see a lot of useful information
You travel all over the country, with comfort and ease!
Discover the "secrets" and the history of each neighboring region
Traffic arrangements will apply to the PATHE motorway to perform repainting work of markings on the road surface.
The works will be performed on Thursday, January 09 to Friday, January 10 (21.00 p.m. to 06.00 a.m.), from (26km) to (17km), direction to Athens, where the right-hand traffic lane and the Emergency Lane will be alternatively closed (per 2 kilometers approximately).
In the meantime, on the same day, from 07.00 a.m. to 16.00 p.m. maintenance works will be performed at the: (138,5km), (36,99km), (39,62km), for the execution of which the left-hand traffic lane on both directions shall be temporarily closed Finally, on Friday, January 10, 2014, at the (85,5km), from 07.00 a.m. to 16.00 p.m., maintenance works will be performed thus, the left-hand traffic lane on both directions shall be temporarily closed.
Nea Odos has taken all the necessary security measures for the safety of the drivers while relevant temporarily signs will be installed in the area to provide fully information regarding the diversion.
Nea Odos wants to thank in advance the drivers for their understanding and also invites them to show extreme caution and follow strictly the relevant signs.